Shoutout to the guy who told me to let my adhesive tack up longer
I was at a supply shop last week and overheard this old installer telling a new guy to wait at least 45 minutes after spreading adhesive before laying carpet. Said most guys rush it and get bubbles. I tried it on a living room job this morning and it laid down way flatter than usual. Has anyone else tested longer tack times or is it just me?