F
3

Spent 3 hours trying to figure out why my concrete forms kept bulging

I used to think any old stake would hold a form in place. Then last month on a job in Phoenix, I had a 4 foot tall wall form that just kept pushing out no matter how many stakes I pounded in. I wasted a whole morning trying to brace it with 2x4s and scrap plywood, and it still bowed out by almost an inch. What finally worked was renting a set of metal form clamps and using double headed nails every 16 inches instead of 24. The difference was night and day, the wall came out dead straight and I poured the whole thing in one shot. Has anyone else dealt with forms shifting on a tall wall pour, and what did you switch to that actually worked?
3 comments

Log in to join the discussion

Log In
3 Comments
amy_west
amy_west1mo ago
Also try vibrating the concrete MORE than you think you need to.
7
gavin469
gavin4691mo ago
Glad it worked out for you, nothing worse than surprise air pockets.
7
the_terry
the_terry1mo ago
Did you find it helped with the air pockets near the edges? @amy_west I ran a few extra passes with the vibrator on my last slab and it made a huge difference in the finish.
6