A 1970s bathroom floor tile job turned into a two day puzzle
I pulled up the old vinyl in a house from 1978 and found the subfloor was a patchwork of three different plywood grades, none of them level. It took me a full day just to map and plane it all down before I could even think about the new tile. What's the longest a simple prep job has ever set you back?