Warning: The week we poured the 40-foot bronze statue base was a total nightmare
Last spring, we got the contract for a huge public art piece in St. Louis. The core was a single pour for a massive base, and everything went wrong from the start. Our main furnace had a refractory crack on Monday, losing us a full heat of metal and putting us a day behind. Then, on pour day, the damn gating system we built just could not handle the volume fast enough, and we started getting cold shuts in the lower sections. I remember the foreman yelling, 'It's setting up in the runners!' We had to stop, re-melt a backup charge, and re-rig the whole thing while the mold was still hot. We finally got it filled, but the stress was unreal. Has anyone else had a big pour go that sideways because of gating, and what did you change for the next one?